Thursday, July 26, 2018
This past week we successfully conducted an L-band engineering flight followed by two science flights in California. We have scheduled 8-10 local flights to catch up with the science observations that have been postponed since late spring. These flights include the Sacramento Delta levee monitoring, the San Andreas Fault monitoring, and the Slumgullion, Colorado landslide study